📱 +86 15301132963 ✉️ Neil@raiseupscaffolding.com Request a Quote !

Scaffolding & Steel Support Supplier in El Salvador

Main port: Acajutla · OSN / EN 12811 · 32-40 days

Main port Acajutla
Compliance OSN / EN 12811
Sea transit 32-40
Currency USD
Key cities San Salvador · Santa Ana · San Miguel
Main industries housing developments, commercial buildings, infrastructure works, industrial plants

Market overview

RaiseUp Scaffolding supplies hot-dip galvanized scaffolding systems, adjustable steel props, steel planks and forged fasteners to contractors in El Salvador. Orders leave our Cangzhou plant for Acajutla in about 32-40 days, with export packing, mill certificates and OSN / EN 12811 compliance documents prepared before loading.

Builders in San Salvador, Santa Ana, San Miguel use our ringlock and cuplock systems for housing developments, commercial buildings, infrastructure works, industrial plants. Because we are a factory rather than a trading company, you can mix one container — say 300 steel props plus 500 steel planks — and get a single bill of lading instead of buying from three suppliers.

Why contractors in El Salvador buy from RaiseUp

Documentation ready for customs

Test reports, mill certificates and OSN / EN 12811 declarations are issued with every shipment, so clearance in El Salvador does not stall at the port.

Direct shipping to Acajutla

We book FOB Tianjin or CIF Acajutla with a transit of roughly 32-40 days, and we can consolidate your order with other suppliers you already work with.

Packing built around the site

Components are bundled by size and labelled by floor or zone — practical on San Salvador, Santa Ana, San Miguel sites where storage space is tight and unloading time is short.

Products we ship to El Salvador

Ringlock Scaffolding System supplied to El Salvador
Scaffolding

Ringlock Scaffolding System

Modular ringlock system for high-rise construction. Hot-dip galvanized steel with rosette connections for fast, safe erection.

Telescopic Steel Prop supplied to El Salvador
Building Materials

Telescopic Steel Prop

Adjustable telescopic steel shore for slab formwork support. Self-cleaning threaded sleeve with heavy-load inner tube.

Rolling Tower Scaffold supplied to El Salvador
Scaffolding

Rolling Tower Scaffold

Mobile folding scaffold tower with lockable casters. Quick storage and one-person mobility for maintenance work.

Adjustable Steel Support supplied to El Salvador
Building Materials

Adjustable Steel Support

Heavy-duty steel support jacks for formwork and shoring. Fine-thread adjustment with safety pin positions.

Forged Scaffolding Couplers supplied to El Salvador
Forging Fasteners

Forged Scaffolding Couplers

Drop-forged swivel, fixed and putlog couplers for 48.3mm tubes. T-bolt clamping with hardened nuts.

Browse products

Frequently asked questions

Do you ship scaffolding to El Salvador?

Yes. We ship FOB Tianjin/Xingang or CIF Acajutla almost every week, with a sea transit of about 32-40 days. The minimum order is one 20GP container, and mixed loads are accepted.

Is your scaffolding compliant with OSN / EN 12811?

Our systems are manufactured to EN 12810 / EN 12811, and we prepare OSN / EN 12811 documentation — test reports, material certificates and erection drawings — for customs and site approval.

What is the lead time for an order to El Salvador?

Production takes 15 to 25 days depending on quantity, then 32-40 days of sea freight to Acajutla. Repeat orders of stock items usually ship within 10 days.

Get a El Salvador price list

Send your BOQ or drawing and we reply within 12 hours with FOB and CIF Acajutla pricing.

💬 ✉️ 📞