Documentation ready for customs
Test reports, mill certificates and INTN / EN 12811 declarations are issued with every shipment, so clearance in Paraguay does not stall at the port.
Main port: Montevideo / Buenos Aires · INTN / EN 12811 · 45-52 days
RaiseUp Scaffolding supplies hot-dip galvanized scaffolding systems, adjustable steel props, steel planks and forged fasteners to contractors in Paraguay. Orders leave our Cangzhou plant for Montevideo / Buenos Aires in about 45-52 days, with export packing, mill certificates and INTN / EN 12811 compliance documents prepared before loading.
Builders in Asunción, Ciudad del Este, Encarnación use our ringlock and cuplock systems for housing developments, roads and bridges, power and energy projects, industrial plants. Because we are a factory rather than a trading company, you can mix one container — say 300 steel props plus 500 steel planks — and get a single bill of lading instead of buying from three suppliers.
Test reports, mill certificates and INTN / EN 12811 declarations are issued with every shipment, so clearance in Paraguay does not stall at the port.
We book FOB Tianjin or CIF Montevideo / Buenos Aires with a transit of roughly 45-52 days, and we can consolidate your order with other suppliers you already work with.
Components are bundled by size and labelled by floor or zone — practical on Asunción, Ciudad del Este, Encarnación sites where storage space is tight and unloading time is short.
Modular ringlock system for high-rise construction. Hot-dip galvanized steel with rosette connections for fast, safe erection.
Adjustable telescopic steel shore for slab formwork support. Self-cleaning threaded sleeve with heavy-load inner tube.
H-frame and walk-through frames with quick-lock cross braces. Ideal for façade work and long-run perimeter access.
Mobile folding scaffold tower with lockable casters. Quick storage and one-person mobility for maintenance work.
Heavy-duty steel support jacks for formwork and shoring. Fine-thread adjustment with safety pin positions.
Drop-forged swivel, fixed and putlog couplers for 48.3mm tubes. T-bolt clamping with hardened nuts.
Yes. We ship FOB Tianjin/Xingang or CIF Montevideo / Buenos Aires almost every week, with a sea transit of about 45-52 days. The minimum order is one 20GP container, and mixed loads are accepted.
Our systems are manufactured to EN 12810 / EN 12811, and we prepare INTN / EN 12811 documentation — test reports, material certificates and erection drawings — for customs and site approval.
Production takes 15 to 25 days depending on quantity, then 45-52 days of sea freight to Montevideo / Buenos Aires. Repeat orders of stock items usually ship within 10 days.