📱 +86 15301132963 ✉️ Neil@raiseupscaffolding.com Request a Quote !

Scaffolding & Steel Support Supplier in Libya

Main port: Misrata / Tripoli · LNCSM / EN 12810 · 28-36 days

Main port Misrata / Tripoli
Compliance LNCSM / EN 12810
Sea transit 28-36
Currency LYD
Key cities Tripoli · Benghazi · Misrata
Main industries housing developments, oil & gas projects, roads and bridges, infrastructure works

Market overview

RaiseUp Scaffolding supplies hot-dip galvanized scaffolding systems, adjustable steel props, steel planks and forged fasteners to contractors in Libya. Orders leave our Cangzhou plant for Misrata / Tripoli in about 28-36 days, with export packing, mill certificates and LNCSM / EN 12810 compliance documents prepared before loading.

Builders in Tripoli, Benghazi, Misrata use our ringlock and cuplock systems for housing developments, oil & gas projects, roads and bridges, infrastructure works. Because we are a factory rather than a trading company, you can mix one container — say 300 steel props plus 500 steel planks — and get a single bill of lading instead of buying from three suppliers.

Why contractors in Libya buy from RaiseUp

Documentation ready for customs

Test reports, mill certificates and LNCSM / EN 12810 declarations are issued with every shipment, so clearance in Libya does not stall at the port.

Direct shipping to Misrata / Tripoli

We book FOB Tianjin or CIF Misrata / Tripoli with a transit of roughly 28-36 days, and we can consolidate your order with other suppliers you already work with.

Packing built around the site

Components are bundled by size and labelled by floor or zone — practical on Tripoli, Benghazi, Misrata sites where storage space is tight and unloading time is short.

Products we ship to Libya

Ringlock Scaffolding System supplied to Libya
Scaffolding

Ringlock Scaffolding System

Modular ringlock system for high-rise construction. Hot-dip galvanized steel with rosette connections for fast, safe erection.

Telescopic Steel Prop supplied to Libya
Building Materials

Telescopic Steel Prop

Adjustable telescopic steel shore for slab formwork support. Self-cleaning threaded sleeve with heavy-load inner tube.

Rolling Tower Scaffold supplied to Libya
Scaffolding

Rolling Tower Scaffold

Mobile folding scaffold tower with lockable casters. Quick storage and one-person mobility for maintenance work.

Adjustable Steel Support supplied to Libya
Building Materials

Adjustable Steel Support

Heavy-duty steel support jacks for formwork and shoring. Fine-thread adjustment with safety pin positions.

Forged Scaffolding Couplers supplied to Libya
Forging Fasteners

Forged Scaffolding Couplers

Drop-forged swivel, fixed and putlog couplers for 48.3mm tubes. T-bolt clamping with hardened nuts.

Browse products

Frequently asked questions

Do you ship scaffolding to Libya?

Yes. We ship FOB Tianjin/Xingang or CIF Misrata / Tripoli almost every week, with a sea transit of about 28-36 days. The minimum order is one 20GP container, and mixed loads are accepted.

Is your scaffolding compliant with LNCSM / EN 12810?

Our systems are manufactured to EN 12810 / EN 12811, and we prepare LNCSM / EN 12810 documentation — test reports, material certificates and erection drawings — for customs and site approval.

What is the lead time for an order to Libya?

Production takes 15 to 25 days depending on quantity, then 28-36 days of sea freight to Misrata / Tripoli. Repeat orders of stock items usually ship within 10 days.

Get a Libya price list

Send your BOQ or drawing and we reply within 12 hours with FOB and CIF Misrata / Tripoli pricing.

💬 ✉️ 📞