📱 +86 15301132963 ✉️ Neil@raiseupscaffolding.com Request a Quote !

Scaffolding & Steel Support Supplier in Senegal

Main port: Dakar · ASN / EN 12811 · 36-44 days

Main port Dakar
Compliance ASN / EN 12811
Sea transit 36-44
Currency XOF
Key cities Dakar · Thiès · Touba
Main industries housing developments, infrastructure works, commercial buildings, power and energy projects

Market overview

RaiseUp Scaffolding supplies hot-dip galvanized scaffolding systems, adjustable steel props, steel planks and forged fasteners to contractors in Senegal. Orders leave our Cangzhou plant for Dakar in about 36-44 days, with export packing, mill certificates and ASN / EN 12811 compliance documents prepared before loading.

Builders in Dakar, Thiès, Touba use our ringlock and cuplock systems for housing developments, infrastructure works, commercial buildings, power and energy projects. Because we are a factory rather than a trading company, you can mix one container — say 300 steel props plus 500 steel planks — and get a single bill of lading instead of buying from three suppliers.

Why contractors in Senegal buy from RaiseUp

Documentation ready for customs

Test reports, mill certificates and ASN / EN 12811 declarations are issued with every shipment, so clearance in Senegal does not stall at the port.

Direct shipping to Dakar

We book FOB Tianjin or CIF Dakar with a transit of roughly 36-44 days, and we can consolidate your order with other suppliers you already work with.

Packing built around the site

Components are bundled by size and labelled by floor or zone — practical on Dakar, Thiès, Touba sites where storage space is tight and unloading time is short.

Products we ship to Senegal

Ringlock Scaffolding System supplied to Senegal
Scaffolding

Ringlock Scaffolding System

Modular ringlock system for high-rise construction. Hot-dip galvanized steel with rosette connections for fast, safe erection.

Telescopic Steel Prop supplied to Senegal
Building Materials

Telescopic Steel Prop

Adjustable telescopic steel shore for slab formwork support. Self-cleaning threaded sleeve with heavy-load inner tube.

Rolling Tower Scaffold supplied to Senegal
Scaffolding

Rolling Tower Scaffold

Mobile folding scaffold tower with lockable casters. Quick storage and one-person mobility for maintenance work.

Adjustable Steel Support supplied to Senegal
Building Materials

Adjustable Steel Support

Heavy-duty steel support jacks for formwork and shoring. Fine-thread adjustment with safety pin positions.

Forged Scaffolding Couplers supplied to Senegal
Forging Fasteners

Forged Scaffolding Couplers

Drop-forged swivel, fixed and putlog couplers for 48.3mm tubes. T-bolt clamping with hardened nuts.

Browse products

Frequently asked questions

Do you ship scaffolding to Senegal?

Yes. We ship FOB Tianjin/Xingang or CIF Dakar almost every week, with a sea transit of about 36-44 days. The minimum order is one 20GP container, and mixed loads are accepted.

Is your scaffolding compliant with ASN / EN 12811?

Our systems are manufactured to EN 12810 / EN 12811, and we prepare ASN / EN 12811 documentation — test reports, material certificates and erection drawings — for customs and site approval.

What is the lead time for an order to Senegal?

Production takes 15 to 25 days depending on quantity, then 36-44 days of sea freight to Dakar. Repeat orders of stock items usually ship within 10 days.

Get a Senegal price list

Send your BOQ or drawing and we reply within 12 hours with FOB and CIF Dakar pricing.

💬 ✉️ 📞