Prop spacing is the single number that decides whether a slab pour is boring or expensive. Set the grid too wide and the formwork deflects, the concrete cracks, and someone has to explain a repair order. Set it too tight and you pay for props, labour and crane time you did not need.

This guide walks through the calculation site engineers actually use, with the checks that matter in practice.

Start from the load, not from the prop

A prop does not have a “capacity” you can read off a catalogue and divide into the slab weight. Two numbers matter:

  • Allowable working load at the extension you will actually use. A 48 mm prop rated 20 kN at 2.0 m may be rated 12 kN at 3.5 m — the load drops quickly as the prop extends.
  • Load actually delivered to the prop, which is the wet concrete weight plus formwork plus construction live load plus the dynamic factor during pouring.

A practical allowance for slab support:

Component Typical value
Wet concrete 24–25 kN/m³
Formwork (plywood + bearers) 0.5–0.8 kN/m²
Construction live load 1.5 kN/m²
Pouring impact factor +10% on total

For a 200 mm slab that gives roughly 6.0–6.5 kN/m² of design load. If your prop carries a tributary area of 1.2 m × 1.2 m, that is 1.44 m² × 6.2 kN/m² ≈ 8.9 kN per prop — comfortable for a 20 kN prop at short extension, and comfortable too for a 12–15 kN prop at medium extension.

Turning load into a grid

Divide the allowable load by the design load per square metre, and you get the maximum tributary area per prop. Take the square root and you have your spacing.

spacing = √(allowable prop load ÷ design load per m²)

With 12 kN allowable and 6.2 kN/m² design load: √(12 ÷ 6.2) = 1.39 m. Round down to 1.2 m for a workable module that lines up with standard bearer lengths.

Real sites rarely use one grid everywhere. A common arrangement:

  • 1.2 m × 1.2 m under general slab areas
  • 0.9 m × 0.9 m under beams, drop panels and slab edges
  • 0.6 m × 0.6 m within 1.5 m of a construction joint or a freshly poured adjacent bay

Bracing is not optional

Props are slender columns. Unbraced, their real capacity is a fraction of the catalogue figure. Every shoring field needs:

  1. Horizontal ledgers at roughly 1.5 m vertical intervals, and always in both directions.
  2. Diagonal bracing on the perimeter and at least every third row.
  3. Base plates on sleepers, not directly on a slab or on soft ground.
  4. U-heads with timber walers so the load enters the prop axially instead of eccentrically.

A prop leaning by 20 mm over 3 m has already lost a meaningful part of its capacity through eccentricity — check plumb before you load it.

The five checks before pouring

  1. Extension within the tested range for the load you calculated.
  2. Pins fully through, collars hand-tight, threads clean.
  3. Ledgers and braces pinned, not resting.
  4. Plumb within 1/500, base plates fully bearing.
  5. Nobody has removed a prop to move a barrow since the last inspection.

Where cheap props fail

The failure mode we see most in export orders is not a collapsed prop — it is a prop that arrives with a wall thickness below the drawing. A 2.0 mm nominal tube at 1.7 mm loses around 15% of its section and a disproportionate share of its buckling resistance.

Ask for the wall thickness in the inspection report, not just on the quotation. If a supplier cannot state it, they are not measuring it.