📱 +86 15301132963 ✉️ Neil@raiseupscaffolding.com Request a Quote !

Scaffolding & Steel Support Supplier in Côte d'Ivoire

Main port: Abidjan / San Pédro · CODINORM / EN 12811 · 38-46 days

Main port Abidjan / San Pédro
Compliance CODINORM / EN 12811
Sea transit 38-46
Currency XOF
Key cities Abidjan · Bouaké · San Pédro
Main industries housing developments, infrastructure works, roads and bridges, commercial buildings

Market overview

RaiseUp Scaffolding supplies hot-dip galvanized scaffolding systems, adjustable steel props, steel planks and forged fasteners to contractors in Côte d'Ivoire. Orders leave our Cangzhou plant for Abidjan / San Pédro in about 38-46 days, with export packing, mill certificates and CODINORM / EN 12811 compliance documents prepared before loading.

Builders in Abidjan, Bouaké, San Pédro use our ringlock and cuplock systems for housing developments, infrastructure works, roads and bridges, commercial buildings. Because we are a factory rather than a trading company, you can mix one container — say 300 steel props plus 500 steel planks — and get a single bill of lading instead of buying from three suppliers.

Why contractors in Côte d'Ivoire buy from RaiseUp

Documentation ready for customs

Test reports, mill certificates and CODINORM / EN 12811 declarations are issued with every shipment, so clearance in Côte d'Ivoire does not stall at the port.

Direct shipping to Abidjan / San Pédro

We book FOB Tianjin or CIF Abidjan / San Pédro with a transit of roughly 38-46 days, and we can consolidate your order with other suppliers you already work with.

Packing built around the site

Components are bundled by size and labelled by floor or zone — practical on Abidjan, Bouaké, San Pédro sites where storage space is tight and unloading time is short.

Products we ship to Côte d'Ivoire

Ringlock Scaffolding System supplied to Côte d'Ivoire
Scaffolding

Ringlock Scaffolding System

Modular ringlock system for high-rise construction. Hot-dip galvanized steel with rosette connections for fast, safe erection.

Telescopic Steel Prop supplied to Côte d'Ivoire
Building Materials

Telescopic Steel Prop

Adjustable telescopic steel shore for slab formwork support. Self-cleaning threaded sleeve with heavy-load inner tube.

Rolling Tower Scaffold supplied to Côte d'Ivoire
Scaffolding

Rolling Tower Scaffold

Mobile folding scaffold tower with lockable casters. Quick storage and one-person mobility for maintenance work.

Adjustable Steel Support supplied to Côte d'Ivoire
Building Materials

Adjustable Steel Support

Heavy-duty steel support jacks for formwork and shoring. Fine-thread adjustment with safety pin positions.

Forged Scaffolding Couplers supplied to Côte d'Ivoire
Forging Fasteners

Forged Scaffolding Couplers

Drop-forged swivel, fixed and putlog couplers for 48.3mm tubes. T-bolt clamping with hardened nuts.

Browse products

Frequently asked questions

Do you ship scaffolding to Côte d'Ivoire?

Yes. We ship FOB Tianjin/Xingang or CIF Abidjan / San Pédro almost every week, with a sea transit of about 38-46 days. The minimum order is one 20GP container, and mixed loads are accepted.

Is your scaffolding compliant with CODINORM / EN 12811?

Our systems are manufactured to EN 12810 / EN 12811, and we prepare CODINORM / EN 12811 documentation — test reports, material certificates and erection drawings — for customs and site approval.

What is the lead time for an order to Côte d'Ivoire?

Production takes 15 to 25 days depending on quantity, then 38-46 days of sea freight to Abidjan / San Pédro. Repeat orders of stock items usually ship within 10 days.

Get a Côte d'Ivoire price list

Send your BOQ or drawing and we reply within 12 hours with FOB and CIF Abidjan / San Pédro pricing.

💬 ✉️ 📞